Marlstone Works
Shelter systems · partner programme

Case · Extended grid failure

When the power stays off

Most people who die in these events die of cold, heat, carbon monoxide or lack of medical access — not of the event. This is the hazard where layered energy and a ban on indoor combustion matter most.

SH-00 · REV 1.0Issued 2026-09-20Gates 0 / 7Construction Not authorised
TOPSOIL / ENGINEERED FILLSTIFF CLAYSAND & GRAVEL — PERCHED WATERWEATHERED ROCKROCKGRADE ±0.00−0.0−4.0−8.0−12.0−16.0−20.0mM02DECONM04LIVINGM06MEDICALM07AIRM10POWERM22FIRE CTLM20REFUGE2 × GENM01ENTRANCECREDIBLE COLLAPSE ZONEOF THE SURFACE STRUCTUREM14REMOTE EXITSEPARATE SHAFTDIFFERENT COLLAPSE ZONEMECHANICAL RELEASE, NO POWERPROTECTED INTAKEBLAST VALVE · ISOLATION DAMPERLOCAL ENCAPSULATED LEADBY SOURCE-TERM CALCULATION · NOT A BLANKETEARTH COVER — BY SITE CALCULATIONKEYNOTES01Two exits, different shafts, different collapse zones02Manual release on every protective door, with no power03Air path: filters always, manual crank included04Depth, thickness, shielding: calculated, not cataloguedNOT FOR CONSTRUCTIONCONCEPT STAGE · GATES G0–G6 OPENSCHEMATIC SECTION · S3 MASTER · NOT TO SCALE · INDICATIVE ARRANGEMENT ONLY · REV 1.0
SchematicS3 master · not to scale · indicative arrangement only
GR-01The hazard

Two hours a year, and then the year that is not two hours

Sourced

An extended outage is the one hazard in this set that arrives without a siren, leaves the building undamaged, and still fills an emergency department. Ordinary reliability is close to flat. The tail is not — and the tail is the only part of the distribution anyone buys a shelter against.

≈11 hAverage electricity interruption per US customer in 2024 — in EIA's own words, nearly twice the annual average experienced in the decade beforeUS EIA, Today in Energy. US average SAIFI in 2024 was 1.5 interruptions per customer.
80%Share of those 2024 interruption hours that came from major event days — nearly nine hours of the elevenUS EIA, Today in Energy: major events such as Hurricanes Beryl, Helene and Milton accounted for 80% of the hours without electricity in 2024.
≈2 hOrdinary non-major-event interruption per customer per year — roughly steady from 2013 to 2021, and still roughly two hours in EIA's 2024 reportingUS EIA, U.S. electricity customers averaged seven hours of power interruptions in 2021, 14 Nov 2022
>80 hLouisiana's 2021 state average after Hurricane Ida — the same year Texas ranked among the five states whose customers lost the most hours, and West Virginia's average reached almost 19 hoursUS EIA, 14 Nov 2022. EIA attributes the long 2021 interruptions to extreme weather, naming Winter Storm Uri and Hurricanes Ida and Nicholas.
36 hPuerto Rico's 2025 interruption per customer excluding major events — 19% more than 2024, with a further 23 hours from major event daysUS EIA, Duration of power outages in Puerto Rico not caused by major events increased 19% in 2025, 10 Aug 2026. Interruption frequency there reached nearly 16 per customer, about double 2021.
74.5 GWERCOT record weekly average hourly load, week ending 22 August 2026 — 6% above the previous record of 70.0 GW set in 2023, under sustained high temperaturesUS EIA, Weekly average load in ERCOT continues near record high, 3 Sep 2026. Six consecutive weeks exceeded the 2023 record.

Start with the arithmetic, because the headline hides it. Eleven hours is the 2024 national average, and it decomposes: nearly nine hours from major event days plus roughly two hours of ordinary interruption. EIA publishes both the components and the ratio — 80% of the hours came from major events. Read the other way round, the reliability a household experiences in a normal year has barely moved in a decade. What has moved is the size of the exception.

A state average is not a household's experience — and this is an inference, so we label it. EST. SAIDI averages across every customer in the territory, including the ones who never lost supply. If a state average reaches eighty hours, the customers who actually lost supply were out substantially longer than eighty hours. How much longer is not published at state level; it has to come from the utility's own event reporting for your feeder. We are showing you the shape of the calculation, not a number we derived and then dressed up as a statistic.

Frequency and duration are different problems. The 2024 US average interruption frequency was 1.5 per customer. A household that loses supply once or twice a year for two hours does not need a shelter and should not be sold one. The purchase decision lives entirely in the duration tail: the event where restoration is measured in days, the road is closed, the water system loses pressure, and outside air temperature is doing the damage rather than wind.

Heat is a margin story, and we state it as one. ERCOT hourly load averaged a record 74.5 GW in the week ending 22 August 2026, 6% above the 2023 record and 10% above the highest weekly average of summer 2025, with six consecutive weeks over the old record. A record week of demand is not an outage and we will not present it as one. It is the condition under which the margin between available supply and demand gets thin, which is the same margin that a winter cold snap attacks from the other direction.

Four links, one failure. The last column is the one an honest vendor fills in truthfully.
External linkHow it fails in an extended eventWhat the household losesWho restores it — not us
ElectricityDistribution and transmission damage, or firm load shed to protect the system from collapseHeating and cooling, lighting, refrigeration, well and booster pumps, powered medical devices, and the phone charger that carries every other planThe utility, on its own restoration schedule and its own priority list
Water pressurePump stations without power, frozen or burst mains, and treatment plants that cannot maintain distribution pressureDrinking water, sanitation, and firefighting supply — and a precautionary boil-water notice that arrives precisely when there is neither power nor fuel to boil anythingThe public water system and the state regulator. In Texas, TCEQ publishes the mandatory boil-water notice language and requires systems to report notices and outages immediately (TCEQ).
Heating fuelGas pressure loss, blocked roads, delivery suspended, tanks already low at the start of the eventIndoor temperature — and with it the pressure to burn something, anything, indoorsThe fuel supplier and the roads authority, in that order and neither quickly
Medical accessRoads, staffed facilities, refrigerated medicine, and dialysis or infusion schedules that do not pause for weatherContinuity of treatment for the member of the household who has the least tolerance for any of thisThe health system. A shelter vendor who implies otherwise is selling a clinical service without a licence.
How to read the two indices, so nobody sells you with them

SAIDI is average interruption duration per customer per year. SAIFI is average interruption frequency per customer per year. Both are averages over a whole service territory and both are reported with and without major event days, which is why the same utility can be quoted as excellent and as poor in the same year without anyone lying. When a figure is put in front of you, ask three questions: which territory, which year, and does it include major event days.

We have quoted EIA throughout because it publishes the method alongside the number. Every tile above carries its link. Before this page goes to a specific prospect, replace the national figures with the utility's own reporting for that service territory — a territory number is worth more than a national one, and it is the homework that separates an agent from a brochure.

GR-02What harms people

The building is undamaged. That is exactly the problem.

Engineering reference only

In wind and fire the hazard is outside and visible, and the building either holds or it does not. In an extended outage the hazard is inside, it is slow, and most of it is produced by what people do to stay warm. That single sentence is why this hazard, and not the dramatic ones, is where a layered energy design earns its price.

How we use a named event, and how we will not

The February 2021 Texas event appears below as an engineering reference for how interdependent generation, fuel and water systems fail together, and for what the mortality record says about the mechanism of harm. It is not a threat, not a closing device, and not a story about victims. An agent who opens a meeting with a death toll has told the customer that the product cannot carry the conversation on its own.

The same rule applies to whatever happened locally last winter. Use the mechanism and the site's exposure. Never use a recent local event, and never use a customer's own bad night, as leverage.

246Deaths the Texas Department of State Health Services attributed to the February 2021 winter storm — 148 classed direct, 92 indirect, 6 possibleDSHS final count, reported by the Texas Tribune, 2 January 2022. Deaths were counted from 11 February to 4 June 2021 across 77 counties. Other estimates of excess mortality are substantially higher and are not quoted here, because they use a different method.
≈2/3Share of those deaths recorded as hypothermia — cold, indoors, in buildings that the storm had not structurally damagedTexas Tribune, 2 January 2022, reporting the DSHS breakdown.
8%Share recorded as carbon monoxide poisoning. Exacerbation of pre-existing illness 10%, motor vehicle 9%, fires 4%, falls 4%Texas Tribune, 2 January 2022, reporting the DSHS breakdown. Carbon monoxide is odourless; the exposure is produced indoors, by equipment brought inside during the outage.
4.5M+Homes that lost power in the February 2021 ERCOT event, in an outage the University of Texas Energy Institute records alongside more than USD 195 billion of property damageUniversity of Texas Energy Institute — The Timeline and Events of the February 2021 Texas Electric Grid Blackouts. The same page carries an early count of at least 57 deaths across 25 counties, later superseded by the DSHS statewide figure above — cite each number to its own source and vintage.

Read the breakdown again, slowly. Close to two-thirds of a 246-death count is hypothermia. Those deaths happened indoors, in houses that were still standing, still weatherproof, and still exactly as they had been the week before. The event did not have to touch the building to be lethal. It only had to remove the energy that made the building habitable, for long enough, in the wrong weather.

The second mechanism is the one people create themselves. Carbon monoxide accounted for about 8% of the same count. It comes from a charcoal grill moved inside, a camp stove on a kitchen counter, an oven left open for heat, a generator in a garage or under a window, a vehicle idling in an attached garage. Carbon monoxide has no smell and gives no warning, the alarm that would warn you needs a working battery, and the first symptoms — headache, nausea, confusion — read as exhaustion to people who have been cold for two days.

The third is medical, and it is the one a shelter vendor must be most careful about. Exacerbation of pre-existing illness was 10% of the count. Refrigerated medicine, powered concentrators, dialysis and infusion schedules, and the simple ability to reach a staffed facility on a closed road do not pause for weather. A shelter can hold a refrigeration load. It cannot deliver care, and we will not let that distinction blur in an agent's hands.

The fourth arrives late and is usually forgotten in the quotation. When distribution pressure is lost, a public water system issues a precautionary boil-water notice, because pressure loss is the condition under which contamination can enter the network. That notice tells a household to boil water at the exact moment it has no reliable way to heat anything. Stored water inside the protected volume, with a disinfection route that does not depend on the kitchen, is the answer to that sequence — and the quantity is an output of a calculation, never a brochure figure.

What the buyer assumes, what the record shows, and the design consequence that follows
The buyer's assumptionWhat the record actually showsDesign consequence — not a sales line
The danger is the storm itselfClose to two-thirds of the Texas count was hypothermia, indoors, in undamaged buildingsA thermal envelope and a heat source that does not consume indoor air — not a stronger roof
A generator solves the whole problemCarbon monoxide was about 8% of the same count, and it is produced by equipment placed wrongly, not by equipment failingCombustion is outdoors and interlocked; monitoring is indoors and on the life-safety bus
We can manage for a day or twoMajor-event hours dominate the annual total, and restoration in a severe event is measured in days, not hoursEndurance is sized by mass balance for a stated occupancy — and is therefore TBD until that calculation exists
Water will keep runningPressure loss produces a regulated boil-water notice, which requires heat that the same event has removedIndependent stored water inside the protected volume, plus a disinfection route with a manual fallback
The hospital will be thereExacerbation of pre-existing illness was 10% of the count; roads, staffing and cold chain fail togetherA refrigeration load at P1 and an honest referral to the clinician — a shelter is not a clinical service
The order the record puts them in
  • Cold, indoors, over hours and days — the largest single category in the Texas count.
  • Carbon monoxide from equipment brought inside or placed too close to an opening.
  • Loss of continuity of medical treatment for a household member who was already dependent on it.
  • Loss of safe water, arriving as a boil-water notice at the moment boiling is hardest.
  • In hot-season events the same list inverts to heat, and the design answer inverts with it: rejection of heat rather than retention of it, from the same energy budget.
The people most exposed are the least able to move

Age, mobility limitation, chronic illness and dependence on powered equipment concentrate the risk in the same households. That is a design input, not a marketing angle: it drives the distance from the house to the shelter entrance, the width and threshold of the door, whether a stretcher can pass, and whether the secondary exit is usable by everyone the shelter is sized for. If the household cannot reach and secure the shelter in the time available, it is the wrong shelter for that site, and the right answer may be a different product or a different plan.

GR-03What it does

P0 first, and nothing burns indoors

Two ideas carry this entire hazard. The first is that electrical loads are ranked before the event, not argued about during it. The second is that combustion stays outside the protected volume, with no exception offered to anyone, at any temperature, for any duration.

The load priority ladder, in plain language. Every electrical load in the shelter is assigned to one of four levels before anything is built. P0 is life safety: the things without which a person cannot breathe, see, be warned or get out. P1 is survival continuity: water, sanitation, refrigerated medicine, minimum temperature control. P2 is controlled living: general lighting, hot water, cooking at power, comfort conditioning. P3 is interruptible: the loads that are shed first, automatically, and that nobody should notice.

The rule that makes the ladder worth anything is that a P0 load may never be shed to keep a comfort load running, and that when the energy management system itself fails, the switchboard falls back to exactly the P0 set rather than to whatever was last switched on. Automation that cannot fail safely is not a feature. It is a second failure waiting for the first one.

P0Life safety

May never be shed to keep a comfort load running. If the energy manager itself fails, the switchboard falls back to exactly this set.

  • Air handling controller
  • Duty and standby fans, and their local manual start
  • Hand or foot crank ventilation
  • CO₂, CO, O₂, smoke, radiation and pressure monitoring
  • Protective door and isolation damper control
  • Generator starting, fuel and cooling auxiliaries
  • Low-voltage DC emergency lighting
  • Minimum internal alarm and communication
P1Survival continuity

Held as long as fuel and stored energy allow.

  • Potable water pumping
  • Basic treatment and disinfection
  • Sewage lift and backflow prevention
  • Essential medical isolation equipment
  • Medicine and critical food refrigeration
  • Minimum temperature and humidity control in critical rooms
  • Diesel polishing
P2Controlled living

Timed, rotated or power-limited; run when renewables are producing.

  • Deep wastewater reclamation
  • General living-area air conditioning
  • High-power kitchen equipment
  • Hot water
  • General lighting
  • Non-critical computing
  • Growing lights
P3Interruptible

Shed first, automatically.

  • Decorative lighting
  • Non-essential entertainment
  • Non-critical outlets
  • Deferrable maintenance and charging
Nothing that burns comes inside. There is no version of this rule with an exception.

No engine, generator, charcoal grill, camp stove, unvented fuel heater, barbecue or vehicle operates inside the shelter, inside an attached garage, inside an entry vestibule, or within the zone where the air intake can draw its exhaust. Not with the door propped open. Not for ten minutes. Not because it is cold. This is the single design rule on this page that the mortality record supports most directly, and it is the one an agent is most often asked to bend.

Generating sets, where a site has one, sit outdoors, clear of openings, intakes and the path exhaust takes on a still night, and connect through a transfer switch installed by a licensed electrician under permit. A generator wired directly into house circuits back-feeds the distribution network and can kill the line worker restoring your supply. Carbon monoxide monitoring sits on the protected side, on the P0 bus, with a battery backup that is tested on the maintenance schedule rather than remembered during the event.

What is actually installed, and what stays TBD

  • Air pathProtected intake → isolation damper → pre-filter → particulate filtration → powered supply → controlled exhaust → backflow prevention. Filter grade, airflow rate, final filter resistance and replacement interval are TBD, by site calculation — they depend on occupancy and on what the outside air is doing.
  • MonitoringCO₂, CO, O₂, temperature, humidity and smoke, on the P0 bus, with local alarm that does not depend on a network, a phone or the AI layer.
  • Ventilation redundancyDuty and standby fans with local manual start, a low-voltage DC backup supply, and hand-crank or equivalent ventilation that works when there is no electrical power whatsoever. The manual path rejoins the train before the filters, never around them.
  • EgressTwo independent exits that do not share one shaft or one collapse zone, each openable mechanically from the inside with no power and with the controller failed.
  • WaterIndependent stored water inside the protected volume, potable and non-potable separated, with two-valve manual isolation from any external supply so a pressure-loss event outside cannot pull contamination in. Stored quantity and reclamation capacity are TBD, by site calculation.
  • Medication refrigerationA P1 load, sized against the household's actual pharmacy list and the manufacturer's storage range for each item — not against an appliance catalogue. Runtime is an output of the energy calculation and is TBD until that calculation is signed.
  • Energy layersUtility supply, UPS and battery storage, a generating set located outdoors where the site permits one, and solar where orientation and area allow — each layer with a manual fallback. The S1 concept budget carries a 5–10 kWh storage line; that is a budget line, not a performance claim, and the capacity your site needs is an output of the load calculation.
1GRID2UPS3BATTERY4DIESEL ×2 — INDEPENDENT5WIND6SOLAR / EXTERNAL INPUT7SUPERCAPACITOR BUFFER8LOW-VOLTAGE DC LIFE-SAFETY BUSstill available with no grid, no battery, no controller9PURELY MECHANICAL & HUMANstill available with no grid, no battery, no controllerP0LIFE SAFETYnever shedIF THE ENERGY MANAGER FAILS,THE BOARD FALLS BACK TO EXACTLY THIS SETP1SURVIVAL CONTINUITYheld while fuel lastsP2CONTROLLED LIVINGtimed / rotatedP3INTERRUPTIBLEshed firstNINE LAYERS · EACH WITH A MANUAL FALLBACKFOUR LOAD PRIORITIESM10 ENERGY & DISTRIBUTION · CAPACITIES BY CALCULATION — NOT PUBLISHED AS HEADLINE NUMBERS
diagramM10 — energy layers against four load priorities, each layer with a manual fallback
Endurance in days is an output, not a feature — here is the actual calculation

Endurance is the smallest of several independent ratios, not the largest or the average. In form: stored water ÷ (water demand per person-day × occupants); filter service life ÷ duty hours per day; stored energy ÷ the summed P0 and P1 load; food store ÷ consumption; waste storage volume ÷ production rate; and the rate at which body heat and equipment heat can actually be rejected from the space. The shelter runs out on whichever of those runs out first, and it is rarely the one the customer expected.

Every term in that expression is a site and occupancy input we do not have until a brief is signed and a survey is done. So the honest answer to how many days is TBD, by site calculation, and the S1 concept positioning of roughly 72 hours is a concept basis for the product class, not a performance figure for your installation. A supplier who answers this question on a phone call, before a survey, has told you what their engineering process is worth.

GR-04What it does not do

This does not keep your house running

Read before quoting

This is the section a competitor will not publish, and it is the reason to keep reading. Everything banded below is a need this product does not address. If one of them is what you actually came for, stop here — you need a different answer, and possibly a different supplier.

A shelter is not a whole-home backup power system

It protects a small, defined volume and the people inside it. It does not light your kitchen, run your heat pump, keep your freezer cold or hold your well pump up. If what you want is the house to keep working through an outage, the correct product is a properly sized standby generating set or a home battery system with a transfer switch, specified and installed by a licensed electrician under permit. That is a different scope at a different price, and we would rather say so in the first meeting than discover it at commissioning.

No compliance claim is made before the Authority Having Jurisdiction accepts the installed work. FEMA publishes guidance and does not certify products; the ABCB publishes guidance and does not certify products either. A compliance statement is assembled from a test report bound to its standard, edition, laboratory, specimen configuration, installation condition and validity period; a locally licensed professional's seal; and AHJ acceptance — in that order, and not before. Not at quotation, not at delivery, not at installation.

Threat and need matrix. Banded rows are the ones we do not claim — they are on this page on purpose.
Need or threatClaimed?The honest statement
Filtered, monitored air in a small protected volume while outside supply is goneIn scope, subject to design and site calculationThis is the baseline function at every tier, and it is the one thing the baseline forbids us to delete at any price.
A defined short endurance on stored energy, stored water and a filtered air pathIn scope — quantity TBDThe duration is the output of the mass balance in GR-03. Until that calculation is signed for your site and occupancy, it is TBD.
Manual operation of ventilation, doors and isolation with no power and with the controller failedIn scope — a floor, never removedManual backup for every automated device is a baseline red line at every tier, including the smallest product we are willing to sell.
Keeping the house lit, heated, cooled and runningNot claimedDifferent product, different scope, different trade. Ask a licensed electrician for a standby system and a transfer switch.
A generating set and its fuel, included in the S1 concept budgetNot claimedThe S1 concept budget excludes a large fixed generating set. Its electrical line covers a 5–10 kWh storage allowance and emergency lighting, nothing more. The set, its fuel store, its pad and its transfer switch are a separate local scope with their own permits — and what caps the runtime they buy is the fire marshal's quantity limit, not your budget.
Indefinite off-grid livingNot claimedEndurance is bounded by stored consumables and by waste storage. A number offered without a mass balance behind it is a sales figure, not an engineering one.
Any influence on when grid power returnsNot claimedWe do not own the distribution network. Restoration follows the utility's damage assessment and priority list, and nothing bought from us changes your position in it.
Medical care: dialysis, ventilator support, oxygen therapy, clinical monitoringNot claimedA refrigeration load can be carried at P1. Care cannot. The first call belongs to the treating clinician and to the utility's medical-priority register, before any conversation with us.
Nuclear, biological or chemical protectionNot claimedThe base product carries no ballistic isolation door, no decontamination shower, no biocontainment room and no radiation instrumentation. It must never be marketed as a complete CBRN installation.
A site in a mapped flood hazard area, a floodway, or with high groundwaterNot claimed — refusal caseBelow-grade on a flood-prone parcel is a drowning risk, not a refuge. FEMA P-320 (2024, 6th ed.) sets flood hazard siting and elevation criteria, and an unsuitable flood, landslide or debris-flow site is a No-Go under our own baseline. See the flood case page.
Numbers we will not guess — for anyone, at any price, in any market
  • Burial depth. Steel or concrete thickness. Lead thickness or shielding equivalence.
  • Door pressure or impact rating. Ventilation flow rate. Filter capacity and final resistance.
  • Oxygen or breathing-air quantity. Water storage and reclamation capacity. Diesel inventory and generator capacity.
  • Well depth and recharge rate. Safe occupant count. Safe occupancy duration in days.
  • Each of these is TBD or by site calculation. A number invented to win a meeting becomes a number an expert witness reads back in a deposition.

Thirty days off-grid, straight out of the box.

Endurance in days is the output of a mass balance for your occupancy, your stored water, your filter duty and your summed P0 and P1 load. Until that calculation is signed, the figure is TBD.

A duration invented before a survey is the number that decides whether a household stays inside a shelter that has already run out of water. It is also the first number read back to you in a deposition.

Just run the generator in the entry vestibule when it gets cold — it's vented.

Combustion equipment operates outdoors, clear of openings and intakes, connected through a transfer switch installed by a licensed electrician under permit, with carbon monoxide monitoring on the protected side and on the life-safety bus.

Carbon monoxide has no smell, and in the Texas winter-storm count it was about 8% of deaths (Texas Tribune, 2 Jan 2022). A vent is not a control. Distance, placement, interlock and monitoring are.

Put this in and you'll never lose power again.

You will lose supply at the same moment as your neighbours. What changes is that one protected volume keeps filtered air, monitoring, light, communications and a manual way out while the utility restores supply on its own schedule.

We do not own the distribution network and cannot influence restoration order. A claim that fails on the first outage takes the agent's reputation with it, and the customer only has to test it once.

If a banded row is what you came for, we would rather lose the order

A flood-exposed parcel goes to the flood case page, where the answer is usually not here or not below grade here. A wind and debris requirement goes to the tornado case page, where a tested, listed and correctly anchored assembly does exactly what it says. A wildfire smoke requirement goes to the wildfire case page. Sending a prospect to the page that actually fits them costs one order and earns the next three.

GR-05Approval route

Who signs, who inspects, and who can say no

This hazard adds approvals the other cases do not: a generating set, a battery system, stored fuel and a water connection each bring their own authority to the table. Every one of them can stop the job, and none of them can be satisfied from a factory in another country.

What an AHJ is, and why there is no single US building code

The IBC and IRC are model codes. They carry no force of law until a state or local government adopts them, adoption lags publication by years, and states amend the model text — so the applicable rules can change across a county line. The Authority Having Jurisdiction is the office with legal power to interpret the adopted code, issue the permit, inspect the work and accept or reject it. In practice it is plural: building, fire marshal, health department, floodplain administrator, zoning, and often separate electrical and mechanical inspectors, each an AHJ for their own scope. Their interpretation governs even where we disagree with it.

For private homes there is essentially no mandate anywhere in the US to build a shelter. What the code does is govern the shelter once you build one. The named instruments an agent may cite, bound to their editions, are ANSI/ICC 500-2023 for storm shelter design and construction, and FEMA P-320 (2024, 6th ed.) and FEMA P-361 as guidance. FEMA publishes that guidance and does not certify products; the ABCB does the same in Australia. Neither is a substitute for a laboratory, a registered professional or an inspector.

What the factory owns — and can be held to
  • Product design, fabrication and factory quality control, with weld non-destructive testing and coating inspection recorded rather than asserted.
  • Test reports and listing documentation, carrying standard, edition, laboratory, specimen configuration, installation condition and validity period.
  • Installation manual, certified anchorage detail and the approved-component list — enforced, not suggested.
  • A statement of design basis and explicit limitations: what this product is not designed to do, presented unaltered by the agent.
  • The commissioning protocol, including airtightness, airflow, pressure differential, water quality, black start and the 72-hour occupied test.
  • The owner's manual: applicable threats, prohibited uses, maximum occupancy, maximum duration, maintenance intervals and evacuation conditions.
What stays local — and cannot be bought from us
  • Jurisdiction determination, applicable code edition and identification of every AHJ with a scope in this project.
  • Site-specific structural design, foundation, anchorage, buoyancy and flood siting — owned and sealed by a locally licensed professional engineer.
  • Geotechnical investigation and report, commissioned and interpreted locally.
  • Permit application, drawings, calculations and the stamped submittal; the AHJ decides.
  • Excavation, dewatering, foundation, setting, backfill and site safety, by the general contractor.
  • Electrical, mechanical and plumbing installation and permits, by licensed trades. Final acceptance and the legal compliance determination belong to the AHJ alone.
Status caveat an agent must say out loud, not footnote

At this revision we hold no test report, no product listing and no certified anchorage detail of our own. Under the S1 concept those originate with the tested and listed shell and door supplier in the destination market, and a supplier who cannot produce them is a No-Go under our baseline. Everything in the left column above names the party who will be accountable for that deliverable once a product exists — it is not a claim that the document exists today.

Approvals this hazard adds that the wind and smoke cases do not
ItemWhy it appears in a grid-failure scopeControlling authorityWhere it stops the job
Standby generating set and transfer switchPermanent combustion equipment plus an interconnection with the utility supplyElectrical inspector; licensed electrician under permitSelf-wired generators back-feed the network, endanger line workers and fail inspection outright
Battery energy storageFire behaviour of the installed system, separation distances and permitted locationsFire official, often the controlling AHJ here; electrical inspectorUL 9540A test method data may be requested for the specific product; a location restriction can move the whole equipment layout
Stored fuelQuantity, container type and separation from the structure and from openingsFire marshalA quantity limit caps achievable runtime regardless of what the customer wants to buy
Water storage and any connection to the public supplyCross-connection and backflow risk, made worse by exactly the pressure-loss events this page is aboutHealth department and the water utilityA cross-connection failure fails inspection and can contaminate the public network, not only your tank
Flood zone and FIRM screeningFlood hazard siting and elevation criteria apply before anything else is designedFloodplain administrator; agent and PE prepare itAn unsuitable flood, landslide or debris-flow site is a No-Go, not a design problem to be engineered around
Mechanical ventilation and combustion-appliance clearancesIntake location relative to any exhaust source, and required outdoor airMechanical inspectorAn intake sited where it can draw exhaust is the failure mode that this whole page exists to prevent
Weeks 1–3

Jurisdiction, code edition, AHJ pre-application meeting

Owned by the agent. Identify every AHJ with a scope — building, fire, health, floodplain, electrical, mechanical. Delay usually comes from AHJ scheduling and from discovering there are four of them, not one.

Weeks 1–2, in parallel

Flood, FIRM and hazard screening

Agent and PE. If this screening fails, the project does not continue in its current form and the honest move is to say so in week two rather than month five.

Weeks 2–8

Survey, utility locates, and geotechnical investigation if below grade

Drill rig availability, groundwater re-testing and winter access are the usual causes of slip. Septic and well separation checks queue behind the health department.

Weeks 3–6

Sealed structural, foundation and anchorage design

Licensed PE, waiting on the geotechnical report and on complete product listing documentation. Gaps in the listing package stall this stage more often than the engineering does.

Weeks 3–10

Permit application and plan review — building, electrical, mechanical, plumbing

Comment and resubmittal cycles. A zoning variance, if one is needed, runs on a public hearing calendar and is the largest single schedule risk on this list.

Weeks 2–5 on site

Set, anchorage, rough-in and pre-backfill inspection

Backfilling before the anchorage inspection means excavating again. This is the most expensive avoidable mistake in the sequence and it is always a scheduling failure, never a technical one.

Weeks 2–4

Commissioning, black start and the 72-hour occupied test

Airtightness, airflow, pressure differential, water quality, load and black start are measured and written on a sheet. People sleep in it before anyone signs.

Weeks 1–4

Final inspection and acceptance — the AHJ alone

Indicative total, excluding grant wait and manufacturing lead time: roughly 5 to 10 months. These are planning ranges drawn from typical US residential practice, not commitments, and no jurisdiction has been selected.

Two rules that override commercial pressure

No field modification, penetration or component substitution without formal change control. An agent or contractor who drills the shell, swaps a door, changes hardware or adds an opening has voided the tested assembly, and the certified anchorage detail with it. Doors, frames, hardware and anchorage are tested as a complete assembly — the rating belongs to the assembly, not to the steel.

No compliance claim before AHJ acceptance. An agent who says the installation is compliant before final inspection has made a statement the factory will not stand behind, in a category where that statement is read back years later. Say instead: here is the standard and edition, here is what has been tested, here is what has not, here is what this product is not designed to do, and your AHJ decides.

GR-06Fit and next step

S1 or S2 — and the answers that end the conversation in ten minutes

Concept budget only

This hazard is the natural home of the S1 and S2 tiers, and we say so rather than letting a customer walk themselves up the ladder. S1 is a short, defined endurance for a household with a road out. S2 is for a household or small institution that has to stay self-sufficient through a prolonged utility failure rather than through a passing event.

S1

Transportable single module

A base survival shelter derived by subtraction from the master architecture — not a bunker. Above ground or semi-buried, roughly 18–28 m² of net area at concept scale, 4–8 occupants subject to code, on a 72-hour concept basis. The right answer when the realistic exposure is a multi-day outage and there is a road out once conditions allow.

  • Independent air treatment, never removed at any tier
  • Two independent exits and mechanical door release with no power
  • DC backup fan plus hand-crank ventilation
  • Independent water store and basic sanitation
Concept budget applies
S2

Intermediate multi-module

The master architecture with reduced area, fewer modules, shorter endurance and lower redundancy — but with every life-safety backup intact, because those are the parts a prolonged utility failure actually tests. Preliminary depth 6–15 m by site calculation. Comfort and some redundancy may be reduced; the life-safety floor may not.

  • Two-valve manual isolation of external water and sewer
  • Emergency communications independent of the household network
  • Every life-safety manual backup carried down from the master
Not estimable before G1
Neither

The honest third answer

If what you want is the house to keep running, or a medically supervised power supply for a dependent household member, neither tier is your product. The answer is a standby generating set or home battery with a transfer switch from a licensed electrician, a clinical continuity plan agreed with the treating clinician, and registration on the utility's medical-priority list. We will say this in the first meeting.

Referral, not a sale
S1 concept budget — the only quotable figure on this site, and it is a concept budget requiring local re-validation
LineScope & assumptionUSD
Site investigation, permits, structural and MEP designFlood, foundation, wind, fire and installation review$15,000
Tested / listed steel shelter shell18–28 m² concept scale; final price from supplier quotation and listing scope$42,000
Rated door, vent protection and shell openingsDoor, frame, hardware and certified openings — never modified on site$13,000
Reinforced concrete foundation, anchorage and site worksOrdinary site assumed; abnormal foundations priced separately$28,000
Waterproofing, corrosion protection, insulation, fire-rated finishesHigher if semi-buried; lower for an above-ground scheme$14,000
Clean air, backup fan and environmental monitoringDual purifiers or central filtration, spare cartridges, sensors$17,000
Electrical, 5–10 kWh storage, emergency lightingExcludes a large fixed generator$16,000
Water, sanitation, fire, comms and 72-hour suppliesPackaged water, emergency toilet, extinguisher, weather radio$9,000
Transport, lifting, installation and acceptance testingOne ordinary haul and one lift assumed$11,000
ContingencyAbout 8–10% planned buffer$15,000
Target totalReserve held to the cap — do not spend it early$180,000
If the quote comes back over budget, cut in this order

1. Reduce area and comfort finishes

2. Drop satellite data; keep a weather radio and optional satellite messaging

3. Fewer general outlets, entertainment and non-critical automation

4. Go above ground to avoid excavation, waterproofing and uplift cost

5. Reduce storage capacity — then re-check air-cleaning and comms endurance

Never cut

The rated shell · The rated door assembly · Foundation anchorage · Ventilation · Smoke and CO monitoring · Emergency lighting · Independent professional review

Land, abnormal geotechnical work, large retaining structures, long utility runs, import duty and major site remediation.

How to present that budget without creating a liability

USD 180,000 target with a 200,000 cap is a concept budget, not a quotation and not a price list. It excludes land, abnormal geotechnical work, large retaining structures, long utility runs, import duty and major site remediation. It must be re-validated against local shell, door, anchorage and labour quotations before it reaches a buyer. If local pricing pushes the necessary life-safety items above the cap, the baseline answer is to reduce scale or move to a smaller certified prefabricated unit — never to hold the price with an uncertified door or a reduced anchorage.

The S2 tier has no quotable figure at this revision. S3 capital cost is not estimable. An agent who invents an S2 number to keep a conversation alive has created an expectation the factory will not honour and a gap the customer will remember.

Seven questions. Any one of these answers ends the sales conversation early, which is the point of asking them early.
Ask this, first meetingThe disqualifying answerWhy it ends the conversation
Is the parcel in a mapped flood hazard area, a floodway, or below the base flood elevation?Yes — or unknown and uncheckedBelow grade on a flood-prone parcel is a drowning risk. FEMA P-320 (2024, 6th ed.) sets siting and elevation criteria and an unsuitable site is a No-Go. Go to the flood case page.
Does anyone in the household depend on powered or refrigerated medical support?Yes, and there is no clinical continuity planA shelter is not a clinical service. The treating clinician and the utility's medical-priority register come first; only then is a P1 refrigeration load worth discussing.
What do you expect to be running while the grid is down?The houseWrong product. A whole-home standby system and transfer switch is a different scope, a different trade and a different price.
Who is doing the electrical work, and under whose permit?I'll wire the generator in myselfUnpermitted work fails inspection, back-feeds the network, endangers the line worker restoring supply, and voids the installation manual we are contractually bound to.
Can your shell and door supplier produce test reports, listing documentation and a certified anchorage detail?No, or only a photograph of a testNo-Go under the baseline. We do not substitute an uncertified door or reduce anchorage to protect a price.
How long do you expect to stay inside?As long as it takesEndurance is an output of a mass balance. An open-ended expectation cannot be engineered, cannot be signed and cannot be maintained.
Is there room on the site for a second, independent way out?No, and the site cannot take oneTwo independent exits, not sharing a shaft or a collapse zone, is a floor at every tier. We reduce size before we reduce the floor.
01Why would I buy this instead of a generator?

For many households, a correctly installed standby generating set is the right answer, and an agent who cannot say that sentence is not worth listening to on anything else. A generator solves the electrical problem for as long as it has fuel, has not frozen, has not failed, and is sited where its exhaust cannot reach anyone. It does not solve filtered air, it does not solve monitoring, it does not solve a protected volume with a second exit, and it does not solve the boil-water sequence.

The case for a shelter begins where those four gaps matter: a household that cannot leave, in a long event, with someone inside who has low tolerance for cold, heat or interrupted treatment. If that is not your situation, buy the generator and keep the difference.

02You quote a named disaster. Isn't that fear marketing?

It would be, used the way this category usually uses it. Our rule is written down and it binds every agent: a named event may be cited as an engineering reference for how interdependent systems fail together, or for what a mortality record shows about the mechanism of harm. It may not be used as a threat, as a closing device, or as a story about victims, and a recent local event may not be used in any form.

The practical test: if you removed the death toll from your sentence and the sentence stopped working, it was not an engineering reference. Rewrite it around the mechanism and the site's exposure instead.

03How many days will it actually run?

TBD, by site calculation — and we are aware that is not the answer a buyer wants at a kitchen table. Endurance is the smallest of several independent ratios: stored water against demand, filter life against duty hours, stored energy against the summed P0 and P1 load, food against consumption, waste storage against production, and the rate at which heat can be rejected from the space. Change the occupancy and every one of those changes.

What we will commit to is the method and the evidence: the calculation, signed; the commissioning tests, measured and recorded; and the 72-hour occupied trial, run with people inside before anyone signs the acceptance certificate.

04Is it certified?

Not by FEMA, because FEMA publishes guidance and does not certify products — and the same is true of the ABCB in Australia. Certification in this category means a test report from a laboratory, bound to a named standard and edition, a specimen configuration and an installation condition, plus a locally licensed professional's seal, plus acceptance by your Authority Having Jurisdiction. At this revision we hold no test report, no product listing and no certified anchorage detail of our own; under the S1 concept those come from the tested and listed shell and door supplier in your market.

05Can you quote me a price today?

One figure only: the S1 concept budget, USD 180,000 target with a 200,000 cap, labelled a concept budget and requiring re-validation against local shell, door, anchorage and labour quotations before it means anything for your site. It excludes land, abnormal geotechnical work, large retaining structures, long utility runs, import duty and major site remediation. S2 is not estimable at this revision and S3 capital cost is not estimable at this revision.

The next step is one screening pack, and it is deliberately cheap

Send us six things and we will tell you within two weeks whether this is a project or a referral: the parcel address and FIRM panel; the serving electric utility and the water system; the occupants, their ages and any mobility or medical dependency; what you expect to run; whether the site can carry a second, independent exit; and the name of the building department you would be applying to. We will book the AHJ pre-application meeting off the back of that, or we will tell you it is a no.

We would rather disqualify a site in week two than take a deposit and disqualify it in month five. A screening that ends in no is the cheapest thing we will ever sell you, and it is the reason the next prospect in your territory takes the call.

What an agent attaches when sending this page
  • The claims and exclusions matrix, unaltered — including the banded rows.
  • The responsibility table showing what the factory owns, what the local professional seals, and what the AHJ alone decides.
  • The gate register, so the prospect sees the programme status before they see a product.
  • The owner's manual table of contents: applicable threats, prohibited uses, maximum occupancy, maximum duration, maintenance intervals, evacuation conditions.
  • Nothing else. No renderings of a shelter that does not exist, and no photograph of a disaster.

Top ↑