Marlstone Works
Shelter systems · partner programme

Case · Northern Australia

Cyclone and surge

Wind and debris are solvable with a tested assembly. Storm surge is water, and water plus below-grade is the refusal case — you do not solve a surge problem by burying something.

SH-00 · REV 1.0Issued 2026-09-20Gates 0 / 7Construction Not authorised
TOPSOIL / ENGINEERED FILLSTIFF CLAYSAND & GRAVEL — PERCHED WATERWEATHERED ROCKROCKGRADE ±0.00−0.0−4.0−8.0−12.0−16.0−20.0mM02DECONM04LIVINGM06MEDICALM07AIRM10POWERM22FIRE CTLM20REFUGE2 × GENM01ENTRANCECREDIBLE COLLAPSE ZONEOF THE SURFACE STRUCTUREM14REMOTE EXITSEPARATE SHAFTDIFFERENT COLLAPSE ZONEMECHANICAL RELEASE, NO POWERPROTECTED INTAKEBLAST VALVE · ISOLATION DAMPERLOCAL ENCAPSULATED LEADBY SOURCE-TERM CALCULATION · NOT A BLANKETEARTH COVER — BY SITE CALCULATIONKEYNOTES01Two exits, different shafts, different collapse zones02Manual release on every protective door, with no power03Air path: filters always, manual crank included04Depth, thickness, shielding: calculated, not cataloguedNOT FOR CONSTRUCTIONCONCEPT STAGE · GATES G0–G6 OPENSCHEMATIC SECTION · S3 MASTER · NOT TO SCALE · INDICATIVE ARRANGEMENT ONLY · REV 1.0
SchematicS3 master · not to scale · indicative arrangement only
AC-01The hazard

Two hazards arrive in the same week, and only one of them is wind

Sourced hazard record

A northern wet season delivers wind, water and isolation together. The engineering answer differs for each of the three, and for one of them the honest answer is not a shelter.

How to read the numbers on this sheet

Every figure below is published by an agency, an insurer or a public record, and every figure carries its source. They are here as engineering evidence — to size the design problem and to test whether a given site is servable — and not as motivation. We do not sell with someone else's bad week, and an agent who does is in breach of our channel terms.

≈10 / seasonTropical cyclones per season in the Australian region, of which 3–4 cross the coast (seasons since 1980–81). The post-2000 average sits nearer 8–9.Bureau of Meteorology, Tropical cyclone climatology.
285 km/hEST. Highest *estimated* gust during the crossing of Severe Tropical Cyclone Yasi, 3 February 2011, category 5 at landfall near Mission Beach, Queensland. The Bureau recorded no verified observation of the maximum gust near the centre; the figure is inferred from a 929 hPa barograph trace at Tully Sugar Mill.Australian Disaster Resilience Knowledge Hub — Cyclone Yasi; Bureau of Meteorology, Severe Tropical Cyclone Yasi. An estimated gust is not a measured one, and we present it as an estimate.
≈7 mStorm surge estimated at Mission Beach during that crossing, carrying water up to roughly 300 m inland. A 5 m tidal surge was observed at the Cardwell storm-tide gauge — 2.3 m above Highest Astronomical Tide — and surge at Port Hinchinbrook exceeded 3 m.Australian Disaster Resilience Knowledge Hub — Cyclone Yasi. Surge height is site-specific: it depends on track, shelf bathymetry and the state of the astronomical tide. The gauge figure is measured; the Mission Beach figure is an estimate.
2,252 mmRainfall recorded at Bairds near the Daintree River from Tropical Cyclone Jasper, December 2023 — reported as the highest tropical-cyclone rainfall total on the Australian record.Bureau of Meteorology, Tropical Climate Update, 19 December 2023 — 2,252.0 mm at Bairds over the seven days to 9 am 19 December, ahead of Black Mountain at 2,199.0 mm and Whyanbeel Creek at 2,102.0 mm. The Barron River exceeded its March 1977 record; the Insurance Council of Australia estimated at least AUD 1 billion in damage.
> 500,000Electricity customers who lost supply at some point during Tropical Cyclone Alfred, February–March 2025, across Queensland and northern New South Wales; about 598 mobile sites went down.Australian Disaster Resilience Knowledge Hub — Tropical Cyclone Alfred · ABC News. The Insurance Council of Australia reported more than 116,000 claims by 12 May 2025.
A$1.2 bn+Reported economic losses from the 2025 Queensland flooding as at 12 April 2025. Part of the Ollera Creek bridge fell into floodwater on 2 February, severing the Bruce Highway north of Townsville; the shortest alternative route from Townsville to Ingham added roughly **10 hours**.ABC News — Bruce Highway bridge collapse · Queensland Reconstruction Authority — a temporary structure reopened the link in eight days. Loss total: 2025 Queensland floods, compiling government and insurer reporting.
3 daysDuration the port of Port Hedland was reported closed around Severe Tropical Cyclone Zelia, which peaked at category 5 and crossed the coast near the De Grey River mouth in Western Australia at category 4 on 14 February 2025. Cape Lambert and Dampier also closed.Bureau of Meteorology, Severe Tropical Cyclone Zelia. Record three-day rainfall above 500 mm at De Grey and Pardoo; record flooding on the De Grey River. Peak intensity and landfall intensity are different numbers, and we do not merge them.

Arithmetic 1 — the season is half the year. November to April is 30 + 31 + 31 + 28 + 31 + 30 = 181 days, and 181 ÷ 365 = 0.50. The northern installation window is therefore effectively May–October: excavation, cranage and unsealed-road access are unreliable in the wet. Half the year is the hazard; the other half is the only build season you have. A project that misses the dry window does not slip by a month — it slips by a year, and the deposit sits with the distributor across a full season.

Arithmetic 2 — where the money actually goes. Estimate, and the assumptions are ugly. Take the reported losses: 2022 south-east Queensland and northern NSW flooding, AUD 5.81 bn insured across more than 240,000 claims — the Insurance Council of Australia's final position, and the costliest extreme weather event in Australian history; Tropical Cyclone Jasper, at least AUD 1 bn; 2025 Queensland flooding, above AUD 1.2 bn economic as at 12 April 2025. 5.81 + 1.0 + 1.2 = roughly AUD 8.0 bn of water-driven loss, against AUD 3.5 bn reported for Tropical Cyclone Yasi — the costliest Australian cyclone in nominal terms, though normalised for inflation Cyclone Tracy (1974) is costlier still.

What that comparison is not. It mixes insured losses with economic losses, spans 2011 to 2025 without adjusting for inflation, and covers different geographies and different exposure bases. An insured loss is not an economic loss, and the two are not addable without a caveat this size. It is an order-of-magnitude comparison, not an actuarial one, and a distributor should rebuild it with local data before quoting it to anybody. Sources: Insurance Council of Australia — updated data shows 2022 flood was Australia's costliest, Jasper, 2025 Queensland floods, AIDR — Cyclone Yasi.

The conclusion we draw, and it shapes the rest of this sheet. In this hazard the money follows water, and so do the sites we decline. Wind and windborne debris are a structures-and-connections problem with a testable answer. Storm tide and wet-season flooding are a siting problem, and no assembly we can ship changes where the water goes.

What a crossing actually delivers, in the order it arrives. Sources as cited in the tiles above, plus [Bureau of Meteorology, Tropical Cyclone Knowledge Centre](https://www.bom.gov.au/cyclone/tropical-cyclone-knowledge-centre/).
PhaseWhat arrivesWhat it does to a site
Days out — forecastA tropical cyclone is normally forecast days ahead, and watches and warnings follow as the track tightensThis is the decisive difference from a tornado or an earthquake: there is time to leave. It is the reason that, at the coast, evacuation is the default answer and a shelter is the exception
Hours — the crossingSustained wind, gusts and windborne debris; then a lull as the eye passes, then wind from the opposite directionOne breached opening changes the load case: the envelope is then pressurised from inside and outside at once. Follow the official message on when it is over — the lull is not the end
Minutes to hours — storm tideSurge riding on the astronomical tide, with waves on top; the height depends on track, shelf bathymetry and tide stateYasi drove water to roughly 300 m inland at Mission Beach. Anything below grade in that footprint is a sump with people in it
Hours to days — rainCatchment rainfall that does not stop at the coast and does not stop when the wind doesJasper put 2,252 mm into one gauge and pushed the Barron River past its 1977 record. Riverine flooding peaks after the cyclone has been downgraded
The week after — servicesGrid, water pressure, mobile network and road access, in roughly that order of restorationAlfred: over 500,000 customers off supply and about 598 mobile sites down. 2025 Queensland: a highway bridge failure cut land access northward
The months after — capacityTrades, freight, crane availability and insurance assessment, competing across a whole region at onceRepair demand lands inside the wet season, when the build window is shut. Plan procurement on the May–October window, not on when the customer signs
AC-02What harms

The wind takes the roof. The water takes the site.

Mechanism, not marketing

Buyers arrive asking for a wind rating. The public record says the expensive and dangerous parts are a breached envelope, water that was never a wind problem, and the week after the wind stops.

M-1

The opening fails before the structure does

A door, a window, a roller shutter or a vent takes a debris strike and the building stops being enclosed. Internal pressure rises, the roof is loaded from beneath at the same moment it is lifted from above, and the connections see the sum. This is why cyclonic design in AS/NZS 1170.2:2021 treats windborne debris and adds low-cycle fatigue provisions for cladding and connections — the load reverses thousands of times in one crossing.

M-2

Connections decide it, not thickness

In wind regions C and D, anchorage, hold-down and connection design carry the outcome — not shell thickness. Our engineering baseline makes the door, frame, hardware and anchorage a complete tested assembly, in which substituting any one component ends the evidence; and the Australian regulatory sheet records that structures in Regions C or D face cyclonic requirements including low-cycle fatigue provisions for cladding and connections. A thicker shell on an under-designed hold-down is a heavier object for the uplift to take.

M-3

Water arrives at two different speeds

Storm tide is fast, coastal and tied to the astronomical tide — the difference between a near miss and inundation can be the hour of the day. Catchment flooding is slow, inland and peaks after the wind has gone. A below-grade room is the wrong place to be for both, and for opposite reasons: one fills it in minutes, the other keeps it full for days.

M-4

The week after is the long part

Grid down, water pressure gone, mobile sites down, roads and bridges out, heat and humidity unrelieved, and no certainty about when a crew reaches you. Alfred took over 500,000 customers off supply and about 598 mobile sites down; a 2025 bridge failure severed land access north of Ollera Creek. This is the part a shelter is genuinely for — and the part buyers spend the least time specifying.

The buyer assumption we correct most often

The question we are asked is what wind speed is it rated to. A number on its own answers nothing. A statement that means something names the wind region, terrain category, shielding, topographic condition and importance level, cites the edition of AS/NZS 1170.2 it was calculated under, and is signed by a registered structural engineer for one specific site. We do not publish a wind rating before that exists, and a category number describes the storm, never your building.

Three ways a well-built room still fails people
  • It is entered too late. A cyclone is forecast days ahead. If the household plan is to decide during the crossing, the plan has already failed — and if the site is one that should be evacuated, a shelter on it has made the wrong decision easier to make.
  • It is opened during the lull. The eye passes and the wind returns from the opposite quarter. Occupancy ends when the official message says the system has passed, not when it goes quiet.
  • It is not maintained or drilled. A filter left past its change interval, a hand-crank nobody has turned, a secondary exit stacked with stored goods. A shelter that is not maintained and drilled is a room, not a life-safety system.
AC-03What it does

What a tested assembly actually buys you

Concept stage — G0–G6 not passed

Concrete and mechanical, in the order it matters: one tested assembly rather than a catalogue of parts, an air path that works with the power off, two ways out, and an endurance figure set by the site rather than by a brochure.

The mechanical content, and where a number would be invented

  • One tested assemblyShell, door, frame, hardware and anchorage are proven together, as installed, in one specimen configuration. Swap the door, change the fixings or cut a new opening on site and the evidence stops applying. Any change goes through formal change control — this is a rule we enforce against ourselves, not only against an installer.
  • Anchorage designed for this siteHold-down and anchorage calculated for the site's wind region, terrain category, shielding and topography under the applicable edition of AS/NZS 1170.2, and confirmed by a registered engineer. Foundation type, embedment and fixing schedule: by site calculation.
  • Independent air handling (M07)Protected intake, intake shut-off, pre-filter, particulate filter, powered supply, controlled exhaust, backflow prevention. This is a life-safety floor at every tier, not a premium option. Airflow, filter class, filter capacity and change interval: by site calculation, against the occupancy the engineering finally fixes.
  • A manual path for every automated oneHand-cranked or equivalent non-powered ventilation, rejoining before the filters and never around them. Mechanical door release from inside with the power off and the controller dead. Manual isolation of every external link — air, water, sewer, power, data.
  • Monitoring you can read without a networkCO₂, CO, O₂, temperature, humidity and smoke, displayed locally. No controller and no remote service is the single arbiter of air quality, fire or egress.
  • Two exits that are genuinely twoTwo independent routes to grade, not sharing one shaft, one superstructure or one collapse zone, each openable mechanically from inside without power. In a cyclone the first exit is the one most likely to be blocked by debris — which is precisely why the second is not negotiable.
  • Power, by priorityA low-voltage DC life-safety bus carrying the P0 loads — air control, fans and their local manual start, monitoring, essential door and valve control, emergency lighting, minimum internal alarm and communication. P0 is not shed to keep comfort loads running. Storage capacity and runtime: TBD by site calculation.
  • Water and sanitation, isolatedStored water separated from any external supply by manual isolation, and sanitation with backflow prevention — because the sewer is where the flood re-enters a building that the flood never reached. Stored volume and duration: TBD by site calculation.
What the endurance figure is actually set by

Not by us, and not by a brochure. It is set by how long this site has historically been cut off: road and bridge closure records, the distance to the nearest staffed response, the airstrip or barge that resupplies the area, and the wet-season months in which none of that is reliable. A site two hours from a regional centre and a site on a road that failed for weeks in a past season do not have the same requirement, and we will not print one number for both. The figure is TBD by site calculation, and it is an input the buyer's own history supplies.

Remoteness pushes that figure up, and pushing it up changes the design: more stored water, more filter life, more energy storage, more sanitation capacity — and a larger, more expensive unit. That is a scope conversation to have before a budget is quoted, not after.

Delivery is part of the engineering in the north. The assembly has to arrive by road or barge, be craned into position and be anchored, inspected and commissioned inside the dry window. Sea freight from a China-origin factory adds weeks before port, customs and biosecurity time; the unsealed-road legs are the ones that fail first when the wet arrives early. A programme that assumes a crane can be booked in February for a site north of a single-carriageway highway bridge is not a programme.

AC-04What it does not do

Storm surge is water. Burying something does not solve water.

Refusal case

This is the sheet that costs us sales, and it is the reason the rest of the page can be believed. On a surge-exposed coastal site the honest answer is an above-grade engineered structure outside the mapped extent — or a different site.

The refusal, stated plainly

A below-grade room on a surge-exposed or flood-liable site is a sump. It fills, it tries to float when the water table rises around it, and it traps the people in it while the route out is under water. That is the same refusal we publish on the flood sheet, and the hazard does not change it: storm surge is flood water with a different origin.

Wind and windborne debris are solvable with a tested assembly and an engineered anchorage. Surge is not solvable by burying something. If the site is inside a mapped storm-tide evacuation zone or below the mapped flood extent, we do not have a product for it — we have a site conversation, and the outcome of that conversation may be that the answer is no.

The claim boundary for this hazard. Banded rows are threats we do **not** claim against, in either language, in any market. Basis: the engineering baseline §16.5 product liability, its Go/No-Go criteria, and the Australian regulatory sheet.
ThreatOur positionBasis
Cyclonic wind pressure on the assemblyIn scope, subject to engineering. Designed for a stated wind region, terrain category, shielding, topography and importance level, under the applicable edition of AS/NZS 1170.2, and signed by a registered structural engineer for the siteAS/NZS 1170 series; no rating published before the calculation exists
Windborne debris impact on openingsIn scope, subject to a tested assembly. Shell, door, frame, hardware and anchorage tested together in the installed configuration, with laboratory, specimen configuration, installation condition and validity statedComplete-assembly rule; substitution of any component ends the evidence
Loss of grid power, water pressure and telecommunicationsIn scope. Independent air handling with a manual path, a low-voltage DC life-safety bus, stored water, sanitation with backflow prevention, local monitoring and emergency lighting. Quantities TBD by site calculationLife-safety floor retained at every tier
Smoke, dust and airborne particulatesIn scope as a clean-air function, with filter class and change interval set by calculation and by the published advice of the relevant agency for the contaminant concernedM07 air path; agency guidance cited, never rewritten
Storm surge and storm tide inundationNot claimed. A site inside a mapped storm-tide evacuation zone is an evacuation problem, not a shelter problem. Below grade on such a site is a No-Go under our own gate criteriaGo/No-Go criteria; the same refusal as the flood sheet
Riverine, flash and wet-season catchment floodingNot claimed. Flood-liable sites are declined for below-grade work, and an above-grade unit is sited outside the mapped extent or it is not sitedGo/No-Go criteria; site selection precedes product selection
Direct wave action, coastal erosion, shoreline recession, long-term sea-level changeNot claimed. These are coastal engineering and planning questions with design lives measured in decades, and they are outside the scope of anything we supplyOutside scope; refer to a coastal engineer and the local planning scheme
Landslip and debris flowNot claimed. A landslip- or debris-flow liable site is declinedGo/No-Go criteria
A reason to stay when an authority has told you to leaveNot claimed, and we will not let it be implied. A shelter is a last resort for people who could not leave in time, not a substitute for leaving early. An agent who sells it as a reason to stay is in breach of the channel termsMarketing red line, published as a commitment
Status as a public cyclone shelterNot claimed. Public cyclone shelters in Queensland are a distinct, publicly funded building type governed by Queensland Development Code MP 3.8, mandatory for new public cyclone shelters since 9 May 2023. A private structure is not one, and must not be described as oneQDC MP 3.8 · QLD public cyclone shelter design guidelines
Compliance, ahead of the Authority Having JurisdictionNot claimed. No statement that a product is NCC compliant, Australian Standard compliant or approved, before the AHJ has accepted a specific installation on a specific siteno_compliance_claim_before_AHJ_acceptance = true
Long-term self-sufficient occupation, and any occupant count or occupancy durationNot claimed. What the design supports is a defined wait, and how long that wait can be is a property of the site, not of the product. Occupant count, maximum occupancy duration, stored water, filter life and energy storage are all TBD by site calculation. A duration printed before that calculation exists is a number invented to close a saleProhibited guesses under the engineering baseline; the endurance figure is an output of the AC-03 calculation, never an input to it
A site emergency services cannot reach inside the endurance the owner actually needsNot claimed — No-Go or relocate. Our own gate criteria decline a site in a non-rescuable area, and the north produces them: a failed bridge, a cut highway, a barge-only period. If the road history says weeks and the scope cannot carry weeks, the answer is a different site or no sale — never a larger promiseGo/No-Go criteria: flood, landslip, debris-flow and non-rescuable sites are declined
A unit whose shell, door, openings or anchorage cannot be documentedNot supplied. If a supplier — including us — cannot produce the test, listing and engineering documentation for the shell, the door assembly, every opening and the anchorage, that is a No-Go under our own gate criteria. The gap does not get closed with a thicker wall, a longer warranty or a confident sentenceGo/No-Go criteria; complete-assembly rule; every performance statement carries standard, edition, laboratory, specimen configuration, installation condition and validity
A reduction in a northern Australian insurance premiumNot claimed. We found no evidence that a private shelter by itself reduces a household premium in northern Australia, and we are not insurance advisers. Ask the insurer in writing before buying, and keep the permit documentation — the risk runs the other way too, because an unpermitted structure can complicate a claim or a saleOutside scope; no attributable source supports the claim, so the claim is not made
Numbers we will not guess — not for a deposit, not for a deadline, not for this hazard
  • Burial depth. Steel or concrete thickness. Lead thickness or shielding equivalence.
  • Door pressure rating or impact rating. Ventilation flow rate. Filter capacity and change interval.
  • Oxygen or breathing-air quantity. Stored water and regeneration capacity. Diesel inventory and generator capacity.
  • Bore depth and recharge rate. Safe occupant count. Safe occupancy duration.
  • And the one this hazard invites most — a wind speed. A figure with no wind region, no terrain category, no shielding, no topographic condition, no importance level and no signature is not a rating, it is a sales aid. Every item here is TBD or by site calculation, and a supplier who answers one of them on the phone, before a survey, has just told you what their engineering is worth.

Cyclone-rated shelter — it will take a category 5.

Designed under the applicable edition of AS/NZS 1170.2 for a stated wind region, terrain category, shielding, topography and importance level, and signed by a registered structural engineer for this site.

A cyclone category describes the storm, not your building. A wind claim with no region, no terrain category and no importance level attached is unverifiable, and we do not make one.

It is underground, so the storm surge just passes over the top.

On a surge-exposed or flood-liable site, below grade is a No-Go. The options are an above-grade engineered structure outside the mapped extent, or a different site.

Water fills a below-grade room, and buoyancy and entrapment are the failure modes — not wind. An entrance that is under water is not an entrance.

It is a FEMA-certified safe room, so it is approved in Australia.

Where a US test exists, it is presented as exactly that: a result against ICC 500-2020 and the design guidance in FEMA P-320 (2024, 6th edition), with laboratory, specimen configuration, installation condition and validity stated — and with the statement that it is not an Australian regulatory approval.

FEMA publishes design guidance; it does not certify products. An Australian approval is determined by a registered practitioner and accepted by the Authority Having Jurisdiction, for one installation on one site.

Declining a site is a deliverable

If the answer is no, you get it in writing, with the reason and with what would have to change. That document is worth more to a property owner than a quotation, and it is the reason our agents get called back by the buyers they turned away.

AC-05Approval route

Who signs what, in the north

Indicative planning only

There is a national approval regime for a private bushfire shelter. There is a state regime for a public cyclone shelter. Between those two sits the private cyclone case, and an agent who does not know that will promise a pathway that does not exist.

The structural fact. The NCC's dedicated private-shelter classification, Class 10c, is defined for a private bushfire shelter, governed in NCC 2022 Volume Two by Performance Requirement H7P6, for which there are no Deemed-to-Satisfy Provisions. There is no equivalent dedicated classification for a private cyclone shelter. A private structure in a cyclonic region is therefore approved as an ordinary building class, designed under AS/NZS 1170.2 for the site's wind region, with the importance level a design input agreed with the engineer and accepted by the certifier. Confirm the classification with the certifier for the specific jurisdiction before designing anything.

The regime that does exist is not for you. Public cyclone shelters in Queensland are governed by Queensland Development Code MP 3.8, mandatory for new public cyclone shelters since 9 May 2023, and they are a community building type — state or jointly federally funded, often built as a school or community hall, procured through government tender cycles. That is a different design basis, a different product line and a different sales channel. A private owner is not buying one, and must never be told otherwise.

Wind region is a site fact, not a postcode. AS/NZS 1170.2:2021 re-drew the map: central Australia became A0, the former A1 split into A1 and A5, and Region B split into B1 and B2 with B1 expanded inland around Brisbane. Regions C and D are the cyclonic regions along the northern coasts of Queensland, the Northern Territory and northern Western Australia, with D the small, most exposed coastal strips. Terrain category, shielding and topographic multiplier then move the number substantially within one region — which is why an agent cannot answer this from an address alone.

Edition traceability decides whether a claim survives. The ABCB released NCC 2025 on 1 May 2026; adoption is not synchronised. In Queensland, NCC 2025 is reported mandatory from 1 May 2027, with NCC 2022 Amendment 2 the default until then. The Northern Territory is reported to have opted out of NCC 2025 — confirm directly, do not assume. Every performance statement we issue carries its standard, edition and validity date, because a standard can be superseded between the quotation and the permit application.

What the factory carries
  • Shell and module design intent, and fabrication to a frozen specification.
  • Factory acceptance testing, with material and weld traceability recorded rather than asserted.
  • Test reports naming standard, edition, laboratory, specimen configuration, installation condition and validity.
  • Formal change control over any substitution, material change or site-cut opening.
  • An operation and maintenance manual stating applicable threats, prohibited uses, maximum occupancy (TBD), maximum occupancy duration (TBD), maintenance intervals and the conditions under which occupants evacuate.
What the territory, the owner and their consultants carry
  • Site selection, and the storm-tide and flood check that precedes any product discussion.
  • Geotechnical and hydrogeological survey, including wet-season groundwater and buoyancy.
  • Wind region, terrain category, shielding, topographic multiplier and importance level for the site.
  • Structural certification for the Australian site by a registered engineer — in Queensland, RPEQ registration is required to provide professional engineering services.
  • Building approval through the certifier, every permit, and any Australian compliance statement.
  • Installation to the certified anchorage scheme, commissioning witness, and the maintenance and drill regime afterwards.
Indicative planning assumptions for agent scheduling only — not commitments, not warranties, and not a basis for a contractual delivery date. A first-of-type installation takes longer. Sources: [ABCB general NCC FAQ](https://www.abcb.gov.au/faq/general-ncc) · [NCC 2025 released](https://ncc.abcb.gov.au/news/2026/ncc-2025-released) · [Board of Professional Engineers of Queensland](https://bpeq.qld.gov.au/for-engineers/become-a-rpeq).
JurisdictionReported code positionWho must signIndicative range and key risk
QLD — coastal northNCC 2025 reported mandatory 1 May 2027; NCC 2022 Amendment 2 the default until thenPrivate certifier; RPEQ registered engineer mandatory for professional engineering services5–12 months. Key risks: RPEQ availability, and the cyclonic wind region in the north
NT — Top EndReported to have opted out of NCC 2025 — confirm directly with the regulatorCase by case; confirm practitioner registration and certifier appetite before quotingNot estimable. Small jurisdiction, limited precedent, no established pathway for this building type
WA — Pilbara and KimberleyNCC 2025 transition window applies; confirm the edition in force at permit applicationCertified or uncertified building permit application; registered practitioners per the state regime5–12 months. Key risks: the transition window, cyclonic regions in the north, and remote access
Any jurisdiction — the gating itemSite classification against mapped storm-tide and flood extents, before designThe local authority's mapping, read by the owner's consultant — not by us and not by an agentDays, and it can end the project. Do this first: it is the cheapest No-Go available
One state programme worth knowing about

Queensland runs a Household Resilience Program offering funding to help eligible owners in coastal parts of the state improve the cyclone resilience of an existing home, with Phase 4 reported open and an additional AUD 20 million allocated (Queensland Government). It funds work on the existing house, not a shelter purchase, and it is frequently the better first spend for a buyer whose roof and openings predate current cyclonic construction practice. Say so. A buyer who is told the truth about a cheaper option remembers who told them.

AC-06Fit & next step

Which tier fits, and the answers that end the conversation early

Concept budget — re-validate locally

A fast no is cheaper for everyone than a slow maybe. These are the questions an agent asks in the first meeting, in this order, because four of them can end it before anyone pays for a survey.

S1

Base tier — the usual fit here

Above-grade or semi-buried, a tested shell and door assembly with independent air handling. On a northern site the semi-buried preference may not survive engineering review: in regions C and D, anchorage and hold-down dominate, and wet-season groundwater argues against going down. Treat above-grade as the starting assumption and let the engineer move it.

Concept only
S2

Mid tier — site-dependent

More modules and longer endurance, which in this hazard means more depth — exactly what a high wet-season water table, buoyancy and the local absence of a dedicated below-ground water-exclusion Standard argue against. Viable inland, on ground that a geotechnical survey supports. Not a coastal answer.

S3

Master tier — not a surge-coast product

The master architecture exists so that the smaller tiers are subtractions from a complete design rather than cheaper inventions. Its capital cost is not estimable at this revision, and a surge-exposed coastal site is not where it belongs.

The only price on this page

The S1 concept budget is USD 180,000 against a USD 200,000 cap. It is a concept budget, and it must be re-validated against local shell, door, anchorage, crane and labour quotations before it reaches a buyer. It excludes land, abnormal geotechnical conditions, major retaining works, long utility runs, import duties and significant site remediation. In the north, add wet-season freight risk, remote-access cartage and the cost of a crane booked inside a six-month window.

If local pricing pushes the life-safety items past the cap, the response is to reduce scale or move to a smaller certified prefabricated unit. It is never to cheapen the door, the anchorage, the ventilation or the professional review. Those four are the items that do not get cut.

011. Is the site inside a mapped storm-tide evacuation zone?

If yes, stop. The answer for that site is an evacuation plan and a route out, not a room to stay in. We will not sell a shelter whose effect is to make staying feel reasonable, and we will say so in writing to the owner. Ask the owner's consultant to read the local authority's mapping — not the agent, and not us.

022. Is any part of the proposed structure below grade, and is the site flood-liable?

Below grade plus flood-liable is a No-Go under our own gate criteria, and no amount of membrane, sump or door rating changes that. If the site is flood-liable but the structure can be sited above grade and outside the mapped extent, the conversation continues. If it cannot, the answer is a different site.

033. What is the wind region, terrain category, shielding and topographic condition — and who will sign for them?

If nobody in the room can answer, engineering has not started and a quotation would be fiction. In Queensland the signature has to come from an RPEQ registered engineer. Get that name before a deposit, not after.

044. How long has the road to this site actually been closed in past wet seasons?

This is the question that sets the endurance requirement, and the owner is the one who holds the answer. If the honest figure is days, the base tier is arguable. If it is weeks — a failed bridge, a cut highway, a barge-only period — the requirement is larger than the base tier is positioned for, and the choices are a larger scope, a different site, or no sale. The endurance figure itself stays TBD by site calculation until that history is on paper.

055. Can a truck and a crane reach the site between May and October, and is a certifier engaged?

Access and the dry window decide the programme; the certifier decides whether the programme is legal. Both belong in the first meeting. A signature in February does not produce an installation in March — it produces a place in next year's dry season.

Week 0

The site facts pack

Lot and address, storm-tide zone status, mapped flood extent, wind region and terrain category, access and crane route, services, and the name of the certifier. No pack, no quotation — and that rule is not negotiable, because a quotation without it is a guess with a decimal point.

Weeks 2–6

Feasibility and gate review

We answer in writing: proceed, change the scope, or decline — with the reason. A decline names what would have to change for the answer to be different.

Months 2–6

Engineering and approval

Local registered engineer, certifier, structural and services documentation, and the approval route for the jurisdiction. Indicative only — a first-of-type installation runs longer, and the range in AC-05 is a planning assumption, not a commitment.

May–Oct

Delivery, installation, commissioning

Factory acceptance before anything ships, site acceptance on the certified anchorage, system commissioning with measured numbers on a sheet, integrated testing with faults deliberately injected, and a 72-hour occupied trial before acceptance. People sleep in it before anyone signs.

Where this sheet sits in the programme

Decision gates G0 to G6 are not passed, and construction_authorized = false. Nothing here is a compliance claim, a certification claim or an offer to build. What an agent can sell today is a feasibility review, an honest site verdict and a documented pathway — and in this hazard, the verdict is the product.